Status: October 2026. Two rules run side by side in District VII. For a new accommodation, under the building code, in a residential building it can only be located on the ground floor, on at most 10% of the residential floor area, with the room sizes prescribed in the decree and a direct bathroom. For an existing accommodation, under Decree 46/2025 (XII. 10.) (in force from 1 January 2026) the number of days it can be let is 0 without a condominium agreement and 365 with one. Next deadline: 31 December 2026 – by this date, accommodations registered by 31 December 2025 must submit the document proving the condominium agreement to the jegyző (the municipal notary). In addition, the Budapest moratorium also runs until 31 December 2026; as of 21 October 2026 no decision has been made on extending it.
INFORMATION – District VII Airbnb permit
Short-term accommodation / Airbnb in District VII – what to do now, who is affected by what, and why there is so much confusion
1. Purpose of this guide
At present many owners, condominium representatives and operators in District VII mix up several different rules. The biggest misunderstandings typically arise around two questions:
- whether it is true that in District VII only a ground-floor flat can be a short-term accommodation;
- what exactly accommodations that are already operating and were registered earlier must submit by the end of 2026, and whether a new condominium consent is needed in every case. (or.njt.hu)
The purpose of this guide is for the owner to understand exactly:
- which rule applies to what;
- what applies to new permits / new notifications;
- what applies to existing permits;
- when the condominium agreement appeared as a relevant requirement;
- which old documents you need to dig out now;
- when an old document is enough, and when a new condominium decision is needed.
2. The key principle: two separate regulatory packages run at the same time
The current situation in District VII can only be interpreted correctly if two entirely separate questions are treated separately.
2.1. The first question: where, and under what conditions, can a short-term accommodation be located?
This is governed by the Erzsébetváros Building Code (Erzsébetváros Építési Szabályzata, EÉSZ), that is, Local Government Decree 25/2018 (XII. 21.), as subsequently amended. Under the 2025 amendment, commercial accommodation services – including short-term letting and tourism-purpose short-term letting – can be located in a residential building only under certain conditions, including that it is on the ground floor of the building, on at most 10% of the useful residential floor area of the building, with specified minimum room sizes and a direct bathroom. (or.njt.hu)
2.2. The second question: for how many days a year can the accommodation operate?
This is governed by Local Government Decree 46/2025 (XII. 10.). This decree provides that for private and other accommodation, without a condominium agreement the number of days in a calendar year that can be used for accommodation services is 0, and where a condominium agreement exists it is 365. The decree entered into force on 1 January 2026.
2.3. Why does this difference matter?
Because on the market these two rules are often blurred into a single sentence. Yet:
- the statement "it can only be on the ground floor" comes from the building / location rule;
- the statement "the condominium consent must be submitted by the end of 2026" comes from the annual day-limit / operating rule. (or.njt.hu)
The correct interpretation therefore always depends on whether we are talking about a new matter or an existing registered accommodation.
3. Short executive summary
Based on the current official sources, the key findings are as follows:
1. For a new notification / new permit, in District VII a short-term accommodation in a residential building can currently only be located on the ground floor, and further technical, area and chief-architect compliance conditions must also be met. (or.njt.hu)
2. For accommodations already registered by 31 December 2025, the essence of Decree 46/2025 is not an entirely new notification package, but that by 31 December 2026 the owner must obtain, and submit to the jegyző, the document proving the condominium agreement.
3. The concept of a condominium agreement is broader than a separate "consent statement". Under the decree, such an agreement can be a provision that clearly refers to the accommodation in the condominium's general meeting resolution, its organisational and operating rules (SZMSZ) or its deed of foundation.
4. For this reason, in many cases you do not need to obtain a new consent; you need to dig out the old one. If the earlier paperwork already contains a general meeting resolution, an SZMSZ extract, a deed-of-foundation provision or another clear consent document, then in many cases that may also be suitable to meet the current obligation. This is a matter of document-based assessment.
5. The turning point in the district that can be proven with certainty at present is 12 June 2021. According to the footnote to the consolidated text of the EÉSZ in force, the wording of Section 6 (6) that also names the condominium's resolution, SZMSZ or deed of foundation was inserted by Local Government Decree 31/2021 (V. 28.) and has been in force since 12 June 2021. Based on our current research, we were unable to identify with certainty, from an official source, an earlier mandatory District VII rule that was equally clear.
4. The legal background in detail
4.1. National basis: accommodation services are an activity subject to notification
According to the official matters page of Erzsébetváros, accommodation services may be carried out under the relevant national rules and on notification to the trade authority, so it is essentially an activity subject to notification. The matters page also separately links the official notification form. (erzsebetvaros.hu)
This alone, however, does not answer the specific District VII questions, because in addition to the national rules, the district's own specific conditions also apply. (erzsebetvaros.hu)
4.2. The role of the district building code
In District VII the location conditions are governed by Local Government Decree 25/2018 (XII. 21.), that is, the EÉSZ. Under the 2025 amendment, short-term letting can be located in a residential building only in compliance with the requirements of Section 24 and under certain conditions, including that it must be on the ground floor of the building. (or.njt.hu)
4.3. The new operating rule from the end of 2025
Decree 46/2025 (XII. 10.) follows a different logic. Its primary purpose is not to regulate where an accommodation can be located, but for how many days a year it can be used for short-term accommodation services. Under Section 2 of the decree, without a condominium agreement the number of days a year is 0, and with a condominium agreement it is 365. Under Section 8, accommodations registered by 31 December 2025 must obtain the condominium agreement and submit the document proving it to the jegyző by 31 December 2026 at the latest.
5. Timeline – what changed, and when?
5.1. 21 December 2018 – adoption of the EÉSZ
District VII adopted the Erzsébetváros Building Code, Decree 25/2018 (XII. 21.). This became the basis of the later district restrictions.
5.2. 12 June 2021 – the condominium background appears in a way that can be proven with certainty
In the consolidated text of the EÉSZ, Section 6 (6) reads as follows:
an accommodation-service building part or functional unit cannot be located in the absence of legislation or another agreement – including the condominium's resolution, SZMSZ or deed of foundation – and the use of a residential functional unit cannot be changed to such a purpose. According to the footnote to the text, this provision was amended by Local Government Decree 31/2021 (V. 28.), with effect from 12 June 2021.
This is one of the most important results of our current research. This is the date from which it can be proven with certainty that the condominium decision / agreement had expressly appeared in District VII's regulation as a relevant condition.
5.3. The position around 25 September 2025 – a stricter location rule
Decree 33/2025 (IX. 24.) amended Section 6 (6) of the EÉSZ, and under the current rules short-term letting can be located in a residential building only if several conditions are met together: a maximum area share of 10%, ground-floor location, minimum room sizes and a direct bathroom. (or.njt.hu)
5.4. 1 January 2026 – the 0-or-365-day system comes into force
Decree 46/2025 entered into force on 1 January 2026. From then on, without a condominium agreement the number of days that can be used is 0, and with a condominium agreement it is 365. For existing accommodations registered by 31 December 2025, the deadline for submitting the proving document is 31 December 2026.
6. NEW PERMIT / NEW NOTIFICATION – what applies to whom now?
This section applies to those who want to start a new short-term accommodation now, or make a new notification.
6.1. The ground-floor requirement
Below we summarise the conditions on the basis of the council's notification form of October 2025. Always check the newer version of the form and the current way of handling the matter on the erzsebetvaros.hu website.
The first page of the current official Erzsébetváros notification form states clearly that, under Section 6 (6) of the EÉSZ, commercial accommodation services – including short-term letting and tourism-purpose short-term letting – can be located in a residential building only on the ground floor of buildings. (erzsebetvaros.hu)
This means that for new matters a condominium consent alone is no longer enough. If the flat is not on the ground floor, as things stand this is a serious obstacle in its own right. (erzsebetvaros.hu)
6.2. Chief architect's opinion
According to the official notification form, you must attach the opinion of the Urban Development and Operations Department – District Development and Chief Architect Division. This is issued only after the documentation detailed on page 3 has been submitted. (erzsebetvaros.hu)
6.3. Further technical conditions
According to page 3 of the notification form, for the chief architect's opinion you must prove, among other things, that the accommodation:
- is on at most 10% of the useful residential floor area of the building;
- is located on the ground floor;
- meets the minimum room sizes;
- has a direct bathroom for every room;
- has a floor area of the independent functional unit of more than 30 m²;
- has at least one room for extended stays whose smallest floor-plan dimension reaches 3.6 metres. (erzsebetvaros.hu)
6.4. Documents to attach for new matters
According to the official form, for a new notification you must attach, among other things:
- the chief architect's opinion;
- the document proving the legal title of use;
- where necessary, the usufructuary's consent;
- in case of joint ownership, the co-owner's consent;
- for a business entity, a specimen of authorised signatory or a specimen signature;
- the accommodation classification document;
- the document proving the existence of accommodation management software;
- proof of NTAK registration (NTAK being the Hungarian national tourism data service). (erzsebetvaros.hu)
6.5. Conclusion for new matters
For a new notification in District VII, the main question is no longer whether the condominium supports the operation, but whether the flat meets the location conditions of the current EÉSZ at all. The condominium background is important, but it does not replace ground-floor and technical compliance. (erzsebetvaros.hu)
7. EXISTING, ALREADY REGISTERED ACCOMMODATIONS – what to look out for
This section applies to those whose accommodation was already registered by 31 December 2025.
7.1. What exactly does Decree 46/2025 require?
Under Section 8 of the decree, for accommodations registered by 31 December 2025 the accommodation provider is obliged, by 31 December 2026 at the latest, to obtain the condominium agreement under Section 2 (2) and to submit the document proving it to the jegyző.
This wording is very important, because it does not say that the owner has to start an entirely new notification procedure. At this point the purpose of the decree is that the existence of the condominium agreement be proven.
Breaking the rules carries a fine: under the decree the fine can be between HUF 200,000 and HUF 2 million, and the accommodation can be closed for 45 days. It is therefore not worth waiting for the year-end deadline.
7.2. What counts as a condominium agreement?
Under Section 1, point 3 of the decree, a condominium agreement is a provision, set out in the condominium's
- general meeting resolution,
- organisational and operating rules (SZMSZ),
- or deed of foundation,
that clearly refers to the accommodation.
This means that more than one format is acceptable. A "consent statement" issued on a separate sheet is not necessarily the only suitable document. If, for example, the condominium decided on it in a general meeting resolution, or the SZMSZ expressly permits it, that may also be relevant.
7.3. What is the most important practical conclusion?
For most existing owners, the first question is not "do we need to obtain a new consent?", but:
does the earlier paperwork already contain a document that is still suitable to prove the condominium agreement?
8. Especially important: the old document can often be enough
8.1. When can the old document be enough?
If the owner's earlier permit / notification file already contains a document from which the condominium's consent can be established clearly, then you will very likely not need to make a new decision, but to dig out and submit the existing document. This logic is supported by the fact that Decree 46/2025 does not require a "new statement", but proof of the condominium agreement.
8.2. What kind of old document can be suitable?
Typically, these come into consideration:
- a general meeting resolution;
- a certified extract of the minutes;
- the relevant point of the SZMSZ;
- the relevant point of the deed of foundation;
- an earlier, clear condominium consent document.
8.3. What is the critical condition?
That the document clearly refers to the accommodation or to the condominium's acceptance of the operation of a short-term accommodation. If the text is too general, ambiguous, or cannot be clearly linked to the activity, later proof may be weaker. The decree itself indicates this by requiring the condominium agreement to be a provision "clearly referring to" the accommodation.
9. The significance of the date of 12 June 2021
This date is key when examining old paperwork.
Section 6 (6) in the consolidated text of the EÉSZ already contains the rule that an accommodation-service functional unit cannot be located in the absence of legislation or another agreement, and under "another agreement" it expressly names the condominium's resolution, SZMSZ and deed of foundation. According to the footnote, this provision was amended by Local Government Decree 31/2021 (V. 28.), with effect from 12 June 2021.
What does this mean in practice?
For new applications or notifications submitted after 12 June 2021, there is a strong likelihood that the documentation submitted already included a condominium decision, consent or a related document. For this reason, the first and most important step in such matters is to go through the entire old file.
What can be said about matters before 12 June 2021?
Caution is needed here. Based on our current research, we were unable to identify with certainty an earlier official District VII legal provision that required the condominium background to be attached to new permit applications in an equally clear and provable way. For this reason, for matters before 2021 you cannot automatically assume that the old file will certainly contain such a document – although of course it may.
10. The correct interpretation of the claim "Airbnb is only allowed on the ground floor"
This sentence on its own is misleading unless it is stated which type of matter we are talking about.
10.1. What is true?
It is true that under the current district regulation, for new matters, a short-term accommodation in a residential building can only be located on the ground floor. This is supported both by the 33/2025 EÉSZ amendment itself and by the text of the official notification form. (or.njt.hu)
10.2. What is not accurate?
It is not accurate to say that it is Decree 46/2025 of December that states Airbnb is only allowed on the ground floor. That decree regulates the 0-or-365-day system tied to the condominium agreement, not ground-floor location.
10.3. What is the precise professional wording?
The correct wording is this:
For new matters in District VII, under the EÉSZ a short-term accommodation in a residential building can only be located on the ground floor; for existing, registered accommodations, under Decree 46/2025 the condominium agreement must be proven to the jegyző by the end of 2026. (or.njt.hu)
11. What exactly does an existing District VII owner need to do now?
This section is the most important practical block.
11.1. Step one: find the entire old set of documents
The owner should not first organise a new general meeting, but should collect the following documents:
- the earlier notification / registration documentation;
- the attachments belonging to it;
- the condominium's general meeting minutes or an extract;
- any old condominium consent statement;
- the relevant part of the SZMSZ;
- the relevant part of the deed of foundation;
- earlier certificates from the condominium representative (közös képviselő);
- any document that clearly records the condominium's approval or acknowledgement.
11.2. Step two: document-based check
The question is not "is there any paper at all?", but whether the condominium agreement can be established clearly from the document in question. Under Decree 46/2025, a good document is one from which it can be clearly read that the condominium permits or acknowledges the operation of the accommodation, or provides for it in the appropriate condominium document.
11.3. Step three: decide whether the old document is enough
If the earlier document is strong, clear, authentic and relates to the activity, there is a good chance that this is what will need to be submitted to the jegyző. If, however, the document is weak, not specific, incomplete or disputable, it may be advisable to ask for a new condominium decision. What certainly follows from the decree is that the condominium agreement must be proven to the jegyző; the quality of the evidence is therefore a key question.
11.4. Step four: submission by 31 December 2026
Under Decree 46/2025, the deadline for existing accommodations registered by 31 December 2025 is 31 December 2026. By this date, the document proving the condominium agreement must be submitted to the jegyző.
12. When is a new condominium decision likely to be needed?
In the following typical cases the likelihood of needing a new condominium decision increases:
- the owner cannot find any old condominium document;
- only an e-mail or informal letter from the condominium representative is available;
- the old document does not refer to the accommodation, but is only general;
- the old document is not authentic, or there are no full minutes behind it;
- the SZMSZ or deed of foundation has since been amended in the opposite direction;
- the condominium's earlier decision cannot be proven clearly.
In these cases the safest route can often be to obtain a new, express general meeting resolution or another clear condominium document. This follows not directly from the text of the decree but from the requirement of provability. What the decree certainly requires is that the condominium agreement be proven.
13. When is the old document likely to be enough?
The old document is more likely to be enough if:
- the accommodation was notified or regularised after 12 June 2021;
- the file already contains a general meeting resolution, an SZMSZ extract or a deed-of-foundation provision;
- the document clearly refers to short-term accommodation;
- the document is available in an authentic or officially retrievable form.
This is not an automatic legal guarantee, but professionally this is the group in which tracking down the old documents is always the logical first step.
14. Checklist for owners – short practical version
If you already have an operating accommodation in District VII:
- Find the entire original notification / registration file.
- Look in it for any decision or consent from the condominium.
- Check whether it is a general meeting resolution, an SZMSZ, a deed of foundation or another clear document.
- Check that the document actually refers to the accommodation.
- If you have such a document, you will very likely need to submit it to the jegyző.
- If you do not have one, or it is not clear, it is advisable to prepare a new condominium decision.
- The deadline: 31 December 2026.
If you want a new permit / new notification now:
- First examine whether the flat is on the ground floor. (erzsebetvaros.hu)
- Then check chief-architect compliance. (erzsebetvaros.hu)
- The condominium background can only be interpreted alongside these; on its own it does not solve the question of a new permit. (erzsebetvaros.hu)
15. What can you say to the condominium representative?
A correct, professionally accurate sentence reads as follows:
In District VII, whether a new accommodation can be started is not the same question as what an existing accommodation must prove by the end of 2026. For new matters, under the EÉSZ in force, ground-floor location and chief-architect compliance are key conditions. For existing accommodations registered by 31 December 2025, however, under Decree 46/2025 the condominium agreement must be proven by 31 December 2026, and if it already exists in a general meeting resolution, an SZMSZ or a deed of foundation, then that is what needs to be dug out and submitted. (or.njt.hu)
16. Concluding professional position
Based on the official sources currently available, the most defensible professional summary is as follows:
- For new matters, in District VII under the current regulation a short-term accommodation in a residential building can only be located on the ground floor, and chief-architect, technical and area compliance is also required for this. (or.njt.hu)
- For existing matters, the essence of Decree 46/2025 is that accommodations registered by 31 December 2025 must prove the condominium agreement by 31 December 2026.
- The condominium agreement can also be a relevant provision of a general meeting resolution, an SZMSZ or a deed of foundation.
- For this reason, for many owners you should not ask for a new consent first; you should dig out the old one.
- Based on this research, in District VII the appearance of the condominium background that can be proven with certainty is best evidenced from 12 June 2021.
- For matters before 2021, an individual check of the documents is especially important, because we have not been able to confirm with official text an earlier mandatory district rule of the same certainty.
The September 2025 Erzsébetváros rules in brief
In brief, because many people are looking for this: accommodation services (including short-term letting) are an activity subject to notification. The notification must be made to the jegyző, accommodation management software and an accommodation classification are required for the notification; the jegyző checks the notification and, if everything is in order, issues a certificate, and if not, calls for the deficiencies to be remedied. The jegyző inspects operating accommodations every year, so both the documentation and the actual operation must comply. The basis is provided by Act LXXVI of 2009 (Szolgtv.) and Government Decree 239/2009 (X. 20.).
In Erzsébetváros the rules were tightened in two steps:
- Where can it be located? Under the September 2025 amendment (33/2025 (IX. 24.)) of Decree 25/2018 (XII. 21.) (the Erzsébetváros Building Code), commercial accommodation services in a residential building can operate only on the ground floor of the building, on at most 10% of the residential floor area, with the minimum room sizes prescribed in the decree and a bathroom directly connected to every room. The exact dimensions are contained in the text of the decree and in the council's notification form.
- For how many days can it operate? From 1 January 2026, Decree 46/2025 (XII. 10.) allows private and other accommodation 0 days without a condominium agreement and 365 days with one. The agreement can be a general meeting resolution, or a provision of the SZMSZ or the deed of foundation that clearly refers to the accommodation. Breaches carry a fine of between HUF 200,000 and HUF 2 million, or a 45-day closure.
In practice this means that a new accommodation can only be opened on the ground floor and within the 10% area limit; because of the room sizes and bathrooms, many flats do not meet the new conditions; and for operation the condominium agreement is indispensable. The building-code rule applies primarily to new notifications, whereas accommodations that are already registered must, under Decree 46/2025, obtain the condominium agreement and submit it to the jegyző by 31 December 2026 at the latest. Also remember that in Budapest a moratorium on registering new private and other accommodations is in force between 1 January 2025 and 31 December 2026; as of 21 October 2026 no decision has been made on extending it.
Log in to the owner portal and message us there: all your requests in one place, trackable.
Log in to the portalGet an instant quote for your flat, or call us on weekdays between 10:00 and 17:00.


